Countries
![Wind farm](/globalassets/0/..generic-headers/wind-power-header-1_l_2400x520.jpg?width=1280&quality=80)
Norway
Statkraft
Hitra wind farm
Brotas de Macaúbas wind complex
Brotas de Macaúbas wind complex is in the municipality of Brotas de Macaúbas in the state of Bahia.
-
2012Entered into operation
-
95 MWInstalled capacity
-
322.3 GWhAnnual production
The Brotas de Macaúbas wind complex is comprised of three wind farms: Macaúbas (35.07 MW), Novo Horizonte (30.06 MW) and Seabra (30.06 MW).
The wind complex has 57 wind turbines, each with a nominal capacity of 1.67 MW.
![Brotas de Macaúbas wind complex](/globalassets/0/.com/1-about-statkraft/where-we-operate/brazil/brazil_brotas-de-macaubas-wind-complex_1.jpg?width=675&height=450&quality=80)
Company | Ownership share |
Statkraft | 81.31% |
FUNCEF | 18.69% |